As boards from first run were sold, and there is still quite high intrest in this project, i would like to make another run
minimum is 30 boards, so i need to have at least so many takers for this to happend, also, i wouldn't want to make more than 100 - i would rather make another run if that would needed, than get overwhelmed by the amount of shipments i need to make - this is most time consuming part of the process
due to part prices changing, and scale factor, this time board will cost 260pln (currently 80USD according to google) + shipment (20pln or $6 for most parts of the world)
anyways, just to sum it up, board features:
I'm going to keep preorder phase open for a month, then i'll start sending PM to each of you, and collecting money for production. if all goes well, and i won't have +12 weeks delivery times on some components (this is sometimes relaity when it comes to buying larger quantities) you should have boards at your doormates within 3 months.
As usually, i'll update project status here gradually, so noone will be left wondering whether the money one spent are gone
Sebastian
ps. you can find more about it here
minimum is 30 boards, so i need to have at least so many takers for this to happend, also, i wouldn't want to make more than 100 - i would rather make another run if that would needed, than get overwhelmed by the amount of shipments i need to make - this is most time consuming part of the process
due to part prices changing, and scale factor, this time board will cost 260pln (currently 80USD according to google) + shipment (20pln or $6 for most parts of the world)
anyways, just to sum it up, board features:
- 4 slots for OS separate for Colleen and XL/XE mode
- 64k of FLASH for future GUI
- 2 slots for BASIC/CARTRIDGE
- build in, configurable PBI CF card storage (works as PBI in XL/XE mode, and through SDX driver in Colleen mode)
- build in FAT32 loader (SIDE)
- SDX
- onboard RTC
- 1MB Axlon compatible memory expansion for Colleen mode
- 64k/320k/576/1088k total memory available in XL/XE mode
- up to 52k of memory in Colleen mode (configurable)
I'm going to keep preorder phase open for a month, then i'll start sending PM to each of you, and collecting money for production. if all goes well, and i won't have +12 weeks delivery times on some components (this is sometimes relaity when it comes to buying larger quantities) you should have boards at your doormates within 3 months.
As usually, i'll update project status here gradually, so noone will be left wondering whether the money one spent are gone
Sebastian
ps. you can find more about it here